|
Course Project Part 1—Due Week 2 For Part 1 of the Course Project, assume you have been appointed project manager of a new project for your organization. Your first assignment is to create a scope statement and WBS for this project.
For this part of the Course Project, you select a project of your choosing. This selected project will be used in Project Part 1 and Project Part 2. I suggest you verify with your instructor the suitability of your selected project by the end of Week 1. ![]() WRITE THIS ESSAY FOR METell us about your assignment and we will find the best writer for your paper. Get Help Now!Select a project of personal interest. For example, select a project where you can identify realistic cost and scheduling concerns. Opening a small retail storefront or a franchise is one example. When selecting your project, keep in mind the goal of CP-1 is to create a scope statement and WBS. In Project Part 2, you will need to create a budget and schedule for this project. Choose something relatively straightforward. For example, simple start-ups, such as pizza or fast-food franchises, work well because information is readily available. It is preferred that you do NOT pick remodeling a house, but building a house or flipping a house is acceptable. The CP-1 Project Proposal will be structured with the following sections. Cover page including assignment, project title, course, and student contact information The scope statement should be written following guidelines for writing a scope as found in the PMBOK® Guide in Chapter 5. In project Part 2, we create a schedule and accurate budget for your project. You need to focus on detailed cost estimating, scheduling, and cost justification. Estimating includes specific assumptions made during the estimating process, as well as quantities, unit prices, hourly rates for tasks, and accumulated totals. You must justify all of your costs; this includes direct, indirect, variable, fixed, and overhead. The CP-2 Project Proposal will be structured with the following sections. Cover page including assignment, project title, course, and student contact information Submission Requirements The assignment should be submitted as two files: one MS Word file for the scope statement and documentation excerpt for the WBS; and one MS Project file containing the project WBS, schedule, resource loading, and budget information. For CP-3, we will leave CP-2 behind and start fresh. CP-3 is a performance review of a new indoor theme park project. You will utilize the provided project information and data to create a new project schedule, which will represent your project at a specific point during implementation. You will load the information and data into Microsoft Project where the data will serve as the basis for project monitoring and control and earned value analysis. The output of the analysis, combined with a control plan, will be used to support the continuation of your project. The CP-3 Project Performance Report will be structured with the following sections. Cover page including assignment, project title, course, and student contact information Background data for the CP-3 project can be found in Doc Sharing under the Course Project category or from this link: PROJ592_CourseHome_CP3_Start_Data.docx. Submission Requirements CP-3 must be submitted as a single document in MS Word. Information or details created with other tools like Excel or MS Project, such as tables, charts, or graphs, must be incorporated into the MS Word file submittal as an inserted object, such as a JPEG. (For help with MS Project, see the Video Tutorial link below.) Failure to follow this requirement will result in the return of the proposal for re-formatting to the requested MS Word format. Category Points % Description Scope Statement 20 40 The scope statement should be written following the guidelines for writing a scope as found in the PMBOK® Guide in Chapter 5. 20 40 The WBS should be created in MS Project following standard indent and outdent practices used in WBS creation. 10 20 Summarizes the content from the entire document with quantifiable highlights 50 100 A quality paper will meet or exceed all of the above requirements. Assignment title: Project Part 2 Category Points % Description Scope Statement 10 8 The scope statement should be written following the guidelines for writing a scope as found in the PMBOK® Guide in Chapter 5. 30 25 The WBS should be created in MS Project following standard indent and outdent practices used in WBS creation. 10 8 Summarizes the content from the entire document with quantifiable highlights 40 34 Cost estimates for each activity. Capital cost estimates should include building, franchise fees, equipment, and so on, if required for your project. All costs must be accounted for. 30 25 Cost assumptions including a list of assumptions made when deriving your estimates. 120 100 A quality paper will meet or exceed all of the above requirements. Assignment title: Project Part 3 Category Points % Description General Business Presentation and Format 10 8 A professional, well-worded paper with cover page that meets requirements and maintains continuity from start to finish. The paper uses proper references to important information, including items contained in the appendix. It uses appropriate citing and notation. Executive Summary 10 8 Summarizes the content from the entire document with quantifiable highlights, such as overall project cost and schedule performance, estimate to completion, and makes the pitch to project stakeholders to continue the project. This is where you have to act as a project manager and a business person. Schedule 1 10 8 Demonstrates proper use of Microsoft Project and ability to correctly incorporate the provided data and establish a schedule with established baseline and review date at the planned 40% completion date Performance Analysis 30 25 Utilizes earned value data to analyze and provide proper interpretation of the project cost and schedule performance to date. It includes analysis of poorly performing tasks, critical path, and total project performance using earned value indicators such as PV, EV, AC, CV, SV, CPI, and SPI. EAC 15 13 Includes a forward-looking estimate of the project completion date and the final project costs based on the performance analysis Cost and Schedule Control Plan 20 17 Proposes appropriate corrective action(s) that should be taken at this point to put the project back on track based on the performance analysis Revised EAC 15 13 Includes the corrective actions from the control plan, along with the resulting cost impact and schedule impact; uses a cost versus benefit approach Schedule 2 10 8 Includes a revised MSP Gantt chart schedule (required) that reflects the impact of your corrective actions Total 120 100 A quality paper will meet or exceed all of the above requirements. |
|
| Comments from Support Team: | |
|---|---|
| Fee: | $20 |
Introducing our Online Essay Writing Services Agency, where you can confidently place orders for a wide range of academic assignments. Our reputable homework writing company specializes in crafting essays, term papers, research papers, capstone projects, movie reviews, presentations, annotated bibliographies, reaction papers, research proposals, discussions, and various other assignments. Rest assured, our content is guaranteed to be 100% original, as every piece is meticulously written from scratch. Say goodbye to concerns about plagiarism and trust us to deliver authentic and high-quality work.



